Question 1
Which tap is used in wash hand basin?
Option 1 Plumbing Sector Picture1 Plumbing Sector Picture1
Option 2 Plumbing Sector Picture2Plumbing Sector Picture2
Option 3Plumbing Sector Picture3Plumbing Sector Picture3
Option 4Plumbing Sector Picture1 1 1Plumbing Sector Picture1
Right Option1
Question 2
Which connector can be used for connecting pipes of different diameters
Option 1Plumbing Sector Picture8Plumbing Sector Picture8
Option 2Plumbing Sector Picture7Plumbing Sector Picture7
Option 3Plumbing Sector Picture6Plumbing Sector Picture6
Option 4Plumbing Sector Picture5Plumbing Sector Picture5
Right Option3
Question 3
Plumbing Sector Picture9Plumbing Sector Picture9

Why water seal is required in a trap?
Option 1To allow the passage of waste water
Option 2To prevent the follow of waste water
Option 3To prevent the passage of foul gases from the drain
Option 4To block the soil Passage
Right Option1
Question 4
Which is the best ways to remove rust from plumbing fixtures?

Plumbing Sector Picture10
Option 1Lemon and salt
Option 2Pumice stones
Option 3Baking soda
Option 4All of the above
Right Option4
Question 5
What is the primary step in collecting plumbing materials for a project?
Option 1Checking the weather conditions
Option 2Reviewing the drawings and plans for specifications
Option 3Randomly selecting materials from the inventory
Option 4Contacting the supplier for recommendations
Right Option2
Question 6
what is crucial for achieving specified angles and offsets?

Plumbing Sector Picture11 300x179 1
Option 1Random bending
Option 2Bending to specified angles and offsets
Option 3Wall thickness
Option 4Inside Color
Right Option2
Question 7
What should be the thickens of the layer of mortar between two courses of bricks?

Plumbing Sector Picture12
Option 11/4 inch
Option 21/2 inch
Option 33/4 inch
Option 41 inch
Right Option2
Question 8
What is the main purpose of removing damaged elements in brick masonry?
Option 1Enhance structural integrity
Option 2Improve heat insulation
Option 3Increase water resistance
Option 4Reduce maintenance costs
Right Option1
Question 9
Identify the Following step to prepare the surface of masonry before plastering:

Plumbing Sector Picture13
Option 1Apply primer
Option 2Sand the surface
Option 3Moisten the surface
Option 4Color the surface
Right Option3
Question 10
Which maintenance task involves rectifying issues with sparking motors and foundation bolts?
Option 1Tightening bolts
Option 2Repairing leaks
Option 3Replacing worn-out parts
Option 4Identifying faults
Right Option4

Sample Questions: Plumbing Sector, Practical


S.NoSub-sector Job role / QP code /Version /NSQF levelNOSPCQuestion
1Industrial / Non-Industrial PlumbingPlumber – General/PSC/Q0104/4/4PSC/N0131: Install Water Supply SystemsPC12. perform chase cutting, drilling and nailing on a range of building material such as brickwork, concrete, block work, timber etc.Demonstrate chase cutting
2
Industrial / Non-Industrial Plumbing
Assistant Plumber – Generall/   PSC/Q0102/ V4/L3PSC/N0139: Carry out Support Activities for Plumbing WorkPC1. follow work instructions received from plumber or supervisorDemonstrate the steps to write work instructions received from a supervisor?
3Industrial / Non-Industrial PlumbingJal Vitaran Sanchaalak (Water Distribution Operator) (Multi – Skill)/  PSC/Q0122/V1/L4PSC/N0163: Installation and Operations of Plumbing and Water Management SystemsPC1. collect plumbing material as per type, size and requirement based on specifications from drawings and plansWhat are the steps involved in collecting plumbing material as per type, size, and requirement based on specifications from drawings and plans?

Sample Questions: Plumbing Sector, Viva Voce


S.NoSub-sector Job role / QP code / Version/ NSQF levelNOSPCQuestionsAnswer
1Industrial / Non-Industrial PlumbingPlumber – General/PSC/Q0104/4/4PSC/N0131: Install Water Supply SystemsPC6. prepare pipe ends using techniques such as reaming, leveling, filing and grindingName the four techniques used for preparing the pipe endsReaming, leveling, filing and grinding
2Industrial / Non-Industrial PlumbingJal Vitaran Sanchaalak (Water Distribution Operator) (Multi – Skill)/  PSC/Q0122/V1/L4PSC/N0163: Installation and Operations of Plumbing and Water Management SystemsPC1. collect plumbing material as per type, size and requirement based on specifications from drawings and plansWhat is the significance of collecting plumbing materials based on specifications from drawings and plans?a) Ensures accurate execution of the plumbing project by having the right materials in place.
b) Facilitates adherence to project timelines by minimizing delays in material procurement.
c) Helps in cost-efficiency by avoiding wastage or incorrect material usage.
3Industrial / Non-Industrial PlumbingJal Vitaran Sanchaalak (Water Distribution Operator) (Multi – Skill)/  PSC/Q0122/V1/L4PSC/N0174: Carry out associated Basic Masonry and Manhole Construction WorkPC8. consider the safety regulations while setting up scaffoldHow do safety regulations impact the setup of scaffolding in water distribution projects?a. Mitigates risks of accidents or falls
b. Ensures compliance with industry standards
c. Protects workers and surrounding areas from potential hazards