Sample Questions:Construction Sector, Theory
Question 1 | |
---|---|
What among the following is part of preparatory work for painting? | |
Option 1 | Ensuring surface is free from dust, dirt and grease |
Option 2 | Applying putty to fill gaps and depressions |
Option 3 | Measuring the surface to be painted and calculating the appropriate quantity of paint |
Option 4 | All of the above |
Right Option | 4 |
Question 2 | |
---|---|
Identify the tool below used in painting![]() | |
Option 1 | Paint Mixer tool |
Option 2 | Paint edging tool |
Option 3 | Paint moisture checking tool |
Option 4 | Excess paint remover |
Right Option | 2 |
Question 3 | |
---|---|
Identify the item in the image below![]() | |
Option 1 | Wattmeter |
Option 2 | Digital Multi meter |
Option 3 | Energy meter |
Option 4 | Analog multi meter |
Right Option | 2 |
Question 4 | |
---|---|
How are electrical wires placed inside a conduit? | |
Option 1 | By pulling with the help of GI wire from one end of the conduit to the other end |
Option 2 | By pulling them from one end of the conduit to the other |
Option 3 | By insreting them i a smaller daiemter conduit |
Option 4 | By splitting the conduit |
Right Option | 4 |
Question 5 | |
---|---|
How are the tiles stacked at cosctruction site? | |
Option 1 | Horizontally flat |
Option 2 | Vertically on edge |
Option 3 | Standing position |
Option 4 | Randomly |
Right Option | 2 |
Question 6 | |
---|---|
Identify brick bond shown in figure?![]() | |
Option 1 | Stretcher bond |
Option 2 | Header bond |
Option 3 | English bond |
Option 4 | Flemish bond |
Right Option | 1 |
Question 7 | |
---|---|
What is the meaning of rebar statement “6 – 8ɸ @300 c/c”? | |
Option 1 | 8 numbers of 6mm diameter rebar at a spacing of 300 mm center to center |
Option 2 | 300 numbers of 8mm diameter rebar at a spacing of 6 mm center to center |
Option 3 | 8 numbers of 6mm diameter rebar at a spacing of 250 mm center to center |
Option 4 | 6 numbers of 8mm diameter rebar at a spacing of 300 mm center to center |
Right Option | 4 |
Question 8 | |
---|---|
Which tool is used to break the bricks into pieces? | |
Option 1 | Sledge Hammer |
Option 2 | Club Hammer |
Option 3 | Claw Hammer |
Option 4 | Ball peen hammer |
Right Option | 2 |
Question 9 | |
---|---|
How should bagged materials like cement bags and Plaster of Paris bags be stored? | |
Option 1 | On the ground level in an uncovered area |
Option 2 | Above ground level in a covered area, free from moisture |
Option 3 | Stacked on wooden sleepers below ground level |
Option 4 | Stored in a designated hazardous materials area |
Right Option | 2 |
Question 10 | |
---|---|
What is a board bearer in a scaffold? | |
Option 1 | A clip used to fix a toe board to a scaffold tube |
Option 2 | A metal base for distributing load |
Option 3 | Fittings used to fix scaffold tubes together |
Option 4 | A tube spanning across ledgers to support a working platform |
Right Option | 4 |
Sample Questions: Plumbing Sector, Practical
S.No | Sub-sector | Job role / QP code /Version /NSQF level | NOS | Question |
---|---|---|---|---|
1 | Real Estate and Infrastructure construction | Helper Electrician /CON/Q0601/V2/L2 | CON/N0101: Erect and dismantle temporary scaffold up to 3.6-meter height | Carry out cup lock/ pile & coupler scaffolding on the leveled ground up to 3.6 meter ensuring the stability of the scaffold, verticality and horizontalness remains within tolerance limits. |
2 | Real Estate and Infrastructure construction | Assistant Electrician/ CON/Q0602/ V3/ L3 | CON/N0605: Assemble, install and maintain temporary LV electrical panels (distribution boards) at construction site | Demonstrate fixing of switch gear parts and wiring (only top row) ![]() ![]() |
3 | Real Estate and Infrastructure construction | Bar Bender and Steel Fixer/CON/Q0203/V3/L4 | CON/NO204 Read and understand routine drawings/sketches and Bar Bending Schedule | List out main bars, extra bars and stirrups with their position of placement from the given drawing image![]() ![]() |