Sample Questions: Plumbing Sector, Theory
Question 1 | |
---|---|
Which tap is used in wash hand basin? | |
Option 1 ![]() | ![]() |
Option 2 ![]() | ![]() |
Option 3![]() | ![]() |
Option 4![]() | ![]() |
Right Option | 1 |
Question 2 | |
---|---|
Which connector can be used for connecting pipes of different diameters | |
Option 1![]() | ![]() |
Option 2![]() | ![]() |
Option 3![]() | ![]() |
Option 4![]() | ![]() |
Right Option | 3 |
Question 3 | |
---|---|
![]() ![]() Why water seal is required in a trap? | |
Option 1 | To allow the passage of waste water |
Option 2 | To prevent the follow of waste water |
Option 3 | To prevent the passage of foul gases from the drain |
Option 4 | To block the soil Passage |
Right Option | 1 |
Question 4 | |
---|---|
Which is the best ways to remove rust from plumbing fixtures?![]() | |
Option 1 | Lemon and salt |
Option 2 | Pumice stones |
Option 3 | Baking soda |
Option 4 | All of the above |
Right Option | 4 |
Question 5 | |
---|---|
What is the primary step in collecting plumbing materials for a project? | |
Option 1 | Checking the weather conditions |
Option 2 | Reviewing the drawings and plans for specifications |
Option 3 | Randomly selecting materials from the inventory |
Option 4 | Contacting the supplier for recommendations |
Right Option | 2 |
Question 6 | |
---|---|
what is crucial for achieving specified angles and offsets?![]() | |
Option 1 | Random bending |
Option 2 | Bending to specified angles and offsets |
Option 3 | Wall thickness |
Option 4 | Inside Color |
Right Option | 2 |
Question 7 | |
---|---|
What should be the thickens of the layer of mortar between two courses of bricks?![]() | |
Option 1 | 1/4 inch |
Option 2 | 1/2 inch |
Option 3 | 3/4 inch |
Option 4 | 1 inch |
Right Option | 2 |
Question 8 | |
---|---|
What is the main purpose of removing damaged elements in brick masonry? | |
Option 1 | Enhance structural integrity |
Option 2 | Improve heat insulation |
Option 3 | Increase water resistance |
Option 4 | Reduce maintenance costs |
Right Option | 1 |
Question 9 | |
---|---|
Identify the Following step to prepare the surface of masonry before plastering:![]() | |
Option 1 | Apply primer |
Option 2 | Sand the surface |
Option 3 | Moisten the surface |
Option 4 | Color the surface |
Right Option | 3 |
Question 10 | |
---|---|
Which maintenance task involves rectifying issues with sparking motors and foundation bolts? | |
Option 1 | Tightening bolts |
Option 2 | Repairing leaks |
Option 3 | Replacing worn-out parts |
Option 4 | Identifying faults |
Right Option | 4 |
Sample Questions: Plumbing Sector, Practical
S.No | Sub-sector | Job role / QP code /Version /NSQF level | NOS | PC | Question |
---|---|---|---|---|---|
1 | Industrial / Non-Industrial Plumbing | Plumber – General/PSC/Q0104/4/4 | PSC/N0131: Install Water Supply Systems | PC12. perform chase cutting, drilling and nailing on a range of building material such as brickwork, concrete, block work, timber etc. | Demonstrate chase cutting |
2 | Industrial / Non-Industrial Plumbing | Assistant Plumber – Generall/ PSC/Q0102/ V4/L3 | PSC/N0139: Carry out Support Activities for Plumbing Work | PC1. follow work instructions received from plumber or supervisor | Demonstrate the steps to write work instructions received from a supervisor? |
3 | Industrial / Non-Industrial Plumbing | Jal Vitaran Sanchaalak (Water Distribution Operator) (Multi – Skill)/ PSC/Q0122/V1/L4 | PSC/N0163: Installation and Operations of Plumbing and Water Management Systems | PC1. collect plumbing material as per type, size and requirement based on specifications from drawings and plans | What are the steps involved in collecting plumbing material as per type, size, and requirement based on specifications from drawings and plans? |
Sample Questions: Plumbing Sector, Viva Voce
S.No | Sub-sector | Job role / QP code / Version/ NSQF level | NOS | PC | Questions | Answer |
---|---|---|---|---|---|---|
1 | Industrial / Non-Industrial Plumbing | Plumber – General/PSC/Q0104/4/4 | PSC/N0131: Install Water Supply Systems | PC6. prepare pipe ends using techniques such as reaming, leveling, filing and grinding | Name the four techniques used for preparing the pipe ends | Reaming, leveling, filing and grinding |
2 | Industrial / Non-Industrial Plumbing | Jal Vitaran Sanchaalak (Water Distribution Operator) (Multi – Skill)/ PSC/Q0122/V1/L4 | PSC/N0163: Installation and Operations of Plumbing and Water Management Systems | PC1. collect plumbing material as per type, size and requirement based on specifications from drawings and plans | What is the significance of collecting plumbing materials based on specifications from drawings and plans? | a) Ensures accurate execution of the plumbing project by having the right materials in place. b) Facilitates adherence to project timelines by minimizing delays in material procurement. c) Helps in cost-efficiency by avoiding wastage or incorrect material usage. |
3 | Industrial / Non-Industrial Plumbing | Jal Vitaran Sanchaalak (Water Distribution Operator) (Multi – Skill)/ PSC/Q0122/V1/L4 | PSC/N0174: Carry out associated Basic Masonry and Manhole Construction Work | PC8. consider the safety regulations while setting up scaffold | How do safety regulations impact the setup of scaffolding in water distribution projects? | a. Mitigates risks of accidents or falls b. Ensures compliance with industry standards c. Protects workers and surrounding areas from potential hazards |