Construction Sector

  • Theory
  • Practical

Sample Questions:Construction Sector, Theory


Question 1
What among the following is part of preparatory work for painting?
Option 1Ensuring surface is free from dust, dirt and grease  
Option 2Applying putty to fill gaps and depressions
Option 3Measuring the surface to be painted and calculating the appropriate quantity of paint
Option 4All of the above
Right Option4
Question 2
Identify the tool below used in painting

Construction Sector 12
Option 1Paint Mixer tool
Option 2Paint edging tool
Option 3Paint moisture checking tool
Option 4Excess paint remover
Right Option2
Question 3
Identify the item in the image below

Construction Sector Picture24
Option 1Wattmeter
Option 2Digital Multi meter
Option 3Energy meter
Option 4Analog multi meter
Right Option2
Question 4
How are electrical wires placed inside a conduit?
Option 1By pulling with the help of GI wire from one end of the conduit to the other end
Option 2By pulling them from one end of the conduit to the other
Option 3By insreting them i a smaller daiemter conduit
Option 4By splitting the conduit
Right Option4
Question 5
How are the tiles stacked at cosctruction site?
Option 1Horizontally flat
Option 2Vertically on edge
Option 3Standing position
Option 4Randomly
Right Option2
Question 6
Identify brick bond shown in figure?

Construction Sector Picture31
Option 1Stretcher bond
Option 2Header bond
Option 3English bond
Option 4Flemish bond
Right Option1
Question 7
What is the meaning of rebar statement “6 – 8ɸ @300 c/c”?
Option 18 numbers of 6mm diameter rebar at a spacing of 300 mm center to center
Option 2300 numbers of 8mm diameter rebar at a spacing of 6 mm center to center
Option 38 numbers of 6mm diameter rebar at a spacing of 250 mm center to center
Option 46 numbers of 8mm diameter rebar at a spacing of 300 mm center to center
Right Option4
Question 8
Which tool is used to break the bricks into pieces?
Option 1Sledge Hammer
Option 2Club Hammer
Option 3Claw Hammer
Option 4Ball peen hammer
Right Option2
Question 9
How should bagged materials like cement bags and Plaster of Paris bags be stored?
Option 1On the ground level in an uncovered area
Option 2Above ground level in a covered area, free from moisture
Option 3Stacked on wooden sleepers below ground level
Option 4Stored in a designated hazardous materials area
Right Option2
Question 10
What is a board bearer in a scaffold?
Option 1A clip used to fix a toe board to a scaffold tube
Option 2A metal base for distributing load
Option 3Fittings used to fix scaffold tubes together
Option 4A tube spanning across ledgers to support a working platform
Right Option4

Sample Questions: Plumbing Sector, Practical


S.NoSub-sector Job role / QP code /Version /NSQF levelNOSQuestion
1Real Estate and Infrastructure constructionHelper Electrician /CON/Q0601/V2/L2CON/N0101: Erect and dismantle temporary scaffold up to 3.6-meter height Carry out cup lock/ pile & coupler scaffolding on the leveled ground up to 3.6 meter ensuring the stability of the scaffold, verticality and horizontalness remains within tolerance limits. 
2Real Estate and Infrastructure constructionAssistant Electrician/ CON/Q0602/ V3/ L3CON/N0605: Assemble, install and maintain temporary LV electrical panels (distribution boards) at construction siteDemonstrate fixing of switch gear parts and wiring (only top row) 

Construction Sector Picture01
Construction Sector Picture01 300x300 1
3Real Estate and Infrastructure constructionBar Bender and Steel Fixer/CON/Q0203/V3/L4CON/NO204 Read and understand routine drawings/sketches and Bar Bending ScheduleList out main bars, extra bars and stirrups with their position of placement from the given drawing image

Construction Sector Picture02
Construction Sector Picture02