• Theory
  • Practical

Sample Questions: Power Sector, Theory


Question 1
What should the meter reader do when visiting a consumer’s premises?
Option 1Enter without ID and take reading
Option 2Display ID and take reading in front of the consumer’s representative
Option 3Take reading without informing the representative
Option 4Collect payment before taking reading
Right Option2
Question 2
If a meter reader identifies suspicious behavior or fraud in metering and billing, what should they do?
Option 1Ignore it and proceed with the work
Option 2Report it to the company as per the policies and procedures
Option 3Confront the consumer directly about the issue
Option 4Inform a colleague and leave it unresolved
Right Option2
Question 3
All the cables used for DG set intallation should be tagged on________________
Option 1Both sides
Option 2One side
Option 3Anyone side is good enough No need to tag
Option 4Applicable to only critical cables
Right Option1
Question 4
When installing plate earthing, what is the correct procedure for inserting the galvanized iron plate electrode?
Option 1Insert the electrode without grounding it properly
Option 2Insert the galvanized iron plate electrode into the ground and connect it to the earthing system
Option 3Insert the electrode above the ground for easy access
Option 4Use a wooden plate instead of galvanized iron for the electrode
Right Option2

Sample Questions: Power Sector, Practical


S.NoSub-sector Job role / QP code /Version /NSQF levelNOSPerformance CriteriaQuestion
1DistributionAssistant Electricity Meter Reader,
 Billing and Cash Collector/ PSS/Q2403/V2.0/L3
 PSS/N2403: Electricity meter reading, billing & cash collectionPC3. visit the consumer’s premises in day time, display the ID-card and take the meter reading in
 the presence of consumer’s representative
Demonstrate the step by step procedure for taking the electricity meter reading 
2Distribution Assistant Electricity Meter Reader,
 Billing and Cash Collector/ PSS/Q2403/V2.0/L3
PSS/N2403: Electricity meter reading, billing & cash collection PC7. generate electricity bill as per consumer category and deliver it for onward paymentDemonstrate the procedure for generating electricity bill
3Generation, Transmission, Distribution Industrial Electrician/PSS/Q1705/V1.0/L4PSS/N1708: Perform installation and testing of switchgears and cablesPC10. inspect, test, rectify abnormal conditions, and commission connection of the
circuit 
Demonstrate the procedure for inspecting cables

Ready to Transform Talent?

Take the next step with AI-powered assessments that deliver results. Launch your journey with cutting-edge skill solutions.

Assessments Delivered

24/7  Customer Support

Market Driven Innovations